Decommissioning
Authorisation is needed before steps are taken to retire a production facility. This includes providing a revised safety case for approval.
- Approval is needed to remove or discard a structure depending on where it is located, either through the marine consenting process (EEZ/CS) or resource consenting process (territorial waters).
- A revised safety case has to be provided to WorkSafe NZ for approval before a production facility can be retired.